Fourways Communication was commissioned by LU / Metronet to provide a design for the enhancement of the IT across the Throat of St Mary’s Curve.
The Scope of the installation works for the design is broadly defined below:
- To dig trackside ballast for cast concrete bases for new TT posts
- To install new TT brackets
- To install new TT wire to plastic insulators fitted to posts and wall brackets
- To Install new handsets on platforms of St Marys disused station
- To install Luminaires for the TT handsets
- To install all associated cabling for TT feed cables and luminaire supplies
- System testing and BIU with LU / MR DLO
The following materials were used to complete these works:
- Bags of C40 concrete premix
- Fabricated and galvanised TT posts and wall brackets
- Chem-fix studs and chemical anchors
- TT handsets
- Handset luminaires
- TT feed cable
- Luminaire power cable
All works were carried out in engineering hours.