Northumberland Park Depot

project_profile-npd_page_1_image_0007

This high profile project was to extend and re-construct the existing inspection pits to accommodate the new train for the Victoria line, that are to go into operation in 2009. It was key that all works were within programme and exactly as designed to allow for testing and service of the new train.

Precision cutting equipment to cut through the existing platform. Setting out area needed to be accurate.

Specialist breaking equipment to break through the high strength reinforced concrete.

All work areas secure as we progress with the excavation of the existing

We carried out precise cutting techniques using a diamond wire saw to create door openings through the solid concrete wall underneath the running track. The key was not to touch the track

Completed openings with steel supports inserted for supporting the running rail, we fabricated and installed a purpose made staircase for easy access into the inspection pits.

A specially designed Overbridge and handrails were Fabricated and installed for safe pedestrian access over the inspection area.

A great achievement ready in time for the new trains

 Download Northumberland Park Depot Project Sheet PDF

 

 
  • thumb_iso-9001
  • thumb_iso14001
  • thumb_ukas
  • thumb_Linkuplogo
  • thumb_Logo_British_Safety_Council
  • thumb_Logo_Safecontractor
  • Logo_Dartford_Biz_Awards_LOGO
  • thames-gateway-winner-logo